A permit is required when installing or replacing sidewalks and/or stoops. If you have hired a contractor to perform the work, they must obtain a Contractor's Business License with the village before a permit can be issued.

Questions can be directed to the Permitting Division of the Community Development Department at 847-923-4420.


Current Fee

  • Residential: $50
  • Commercial: $260

Submittal Requirements


Required Inspections

  • Sub base/rough inspection
  • Final inspection

All inspections require a 24 hour minimum advanced notice. Schedule inspections up to 4 p.m. on the business day prior to the requested inspection date by submitting a request through the Permit Portal or calling Permit Services at 847-923-4420.


Code Requirements

  • Material Requirements
    • 4 inches concrete over 4 inches of compacted base.
    • 6 bag mix-drive concrete.
    • Minimum walk width is 3 feet.
    • Minimum stoop width and depth is 3 feet
    • Flashing where required by code
    • Maximum side yard walk width shall be 5 feet.
    • Pitch of flat work shall be away from structure.
  • Concrete steps
    • 3/8 inch maximum variable on rise or run
    • guardrail required if stoop is over 30 inches above grade
    • handrails-38 inches high max. space between balusters 4 inches.
    • Grippable hand rail required for stairs with 4 or more rises, 34-38 above
    • Stair nose
    • For residential - maximum rise 7-3/4 inch minimum run 10 inches
    • For commercial - maximum rise 7 inch minimum run 11 inches
  • Other Information
    • Total front yard coverage shall not exceed 40 percent of the front yard
    • Total rear yard coverage shall not exceed 40 percent of rear yard
    • Pavers must be installed per manufacturers specs. Airborne dust must be suppressed with water or alternative method